Before & after
Same bathroom. New tub.
Drag the slider. LJ took this bathroom down to the studs, replaced the plumbing behind the wall and installed a new tub and surround.
- Old tub and walls torn out
- New valve and drain plumbing
- New tub and surround installed
- Work area left clean
Mon–Sat 7:30 AM–5 PM
Leak, clog, no hot water or a new tub? Call the plumber who calls back.
Lionel and Luke explain the problem, fix it right and charge a fair price.
(228) 224-3938